Susan Fuschetto

CIS 201 Systems Analysis & Design
Project 10
- Read Chapter
10 pages 448 - 488 in your textbook.
- Read and work through the Case-Sim: SCR
Associates on page 492. At the end of the simulation session
there is a task list of things you need to do. You may
complete all of the tasks, but I will be only asking for specific
task items for grading purposes. Please be sure to submit
only the task items I request.
- Note: remember you need a password. The
password is sad7.
- Task #1: Task 1 is in this
document. Please review it and use it to help you focus on
the TIMS system design while completing the remaining tasks.
- Task #2: Develop a testing plan
that includes unit testing, integration testing, and system testing.
Refer to Jesse's message in the SCR online case simulation.
- Task #3: Develop a training plan
for the new TIMS system using Jesse's message as a guide. List
the groups that should receive training, the topics to be covered,
and the training methods to be used.
- Task #4: Make a recommendation for a
data conversion plan and a changeover method for TIMS. Also,
create a post implementation review plan. Include the
fact-finding methods, a list of topics to cover, the best time to
conduct the review, and who should perform it.
- Type the following at the top
of your document:
- CIS 201 Project 10
- Class Meeting Day and Time
(example: Wednesday 7:00 PM or Online)
- Your Name
- Submit your homework for grading:
Traditional students: Print
the homework. If there is more than one page please staple
them together. Also, you will be presenting your systems
implementation plans on 12/10/2008.
Online students: Upload
the project document(s) to the Project 10 assignment
in TalonNet. You are welcome to present your designs at the
12/10/2008 class meeting with the other students.
- Optional: Review the PowerPoint
presentation and do the Chapter Review test found on the Lectures &
Chapter Reviews Web page.
Be sure to submit/turn in the project by the
due date.
Last update:
04/23/09 |