Flow Rates and Time Headways
Flow rates and time headways are related to each other: The total elapsed study time is made up of the sum of the headways recorded for each vehicle:
Equation 2
Previous Page / Next Page
Flow rates and time headways are related to each other: The total elapsed study time is made up of the sum of the headways recorded for each vehicle:
Equation 2
Previous Page / Next Page